Thursday, October 22, 2009
Tuesday, October 20, 2009
Shingle removal, Reclaimed wood flooring installation
Bob is removing all the crappy shingles on the North side of the old house, because they discovered that there was a huge patch of wall (about 10'x4') that had no sheathing or vapor barrier at all - just studs right to exterior siding - and that needed to be fixed.
Matt is doing a kickass and fast job installing that old wood as a new floor in the guest room. It looks really solid and really good. Once it gets sanded-down, all that color and texture variation will be very mellowed-out, we think.
Sunday, October 18, 2009
Bathroom sink faucets and reclaimed wood flooring
Yesterday we went to Lowe's and bought two toilets and some tar paper to go under the new wood flooring. While there, Laurel was bowled over by the extent of the bathroom sink faucet selection. Our plumber Ismael had his copper elbows all strewn about in the dirt and I thought it looked cool so I took a picture. Today Matt came over and we began to lay out the reclaimed flooring in the guest bedroom, to see how it's all going to look. Hard to tell at this point, but I think once it's all sanded-down and re-stained it could look pretty nice.
Thursday, October 15, 2009
Siding! Windows! Piles of flooring wood!
Our kitchen island's footprint is indicated in masking tape. Windows are officially installed throughout the addition. We've got some siding up on the new bathroom's exterior, because the electrician needs to attach his box there, so we had to get that up first. You can see our future bathroom is framed-out and ready for electrical wiring. Also I thought our huge, haphazard pile of reclaimed oak wood flooring in the office was funny, so I took a picture of it.
Saturday, October 10, 2009
Kitchen sink and wood flooring bought today
Today we went to Leander, to this gigantic warehouse that sells everything you can imagine, and bought a beautiful Shaw farmhouse ceramic apron sink. It weighs a million pounds, that's why they needed a forklift to get it down off the shelf. Then we went to two different locations in East Austin and picked up a total of about 400 square feet of 1940s-era oak wood flooring, which we are going to install in our new guest bedroom and hallway. Karl and Rendi helped us unload it from my dad's truck into our new house.

Thursday, October 8, 2009
Roof "dried-in"
Now that the wall studs' sheathing is in place, and the roof has been what they call "dried-in," you can really get a sense of the dimensions of the new addition's interior. Next the electrician, plumber and roofer are going to go to town on their respective duties, and we're going to get an HVAC guy up in the attic to distribute the airflow properly. While we're refining our approach to attic insulation, we're also frenetically selecting fixtures, tile and finish colors, so that that's all purchased and ready to go when its time comes to be installed, which'll be fairly soon. This weekend we're going to go buy the remainder of the exterior doors, the wood flooring, and perhaps pick up a kitchen sink we bought out in Leander.
Saturday, September 26, 2009
Thursday, September 17, 2009
Floor framing continues
We had quite a scare there yesterday when we found out the porch floor framing had been installed at the wrong height, and would have to be re-done. Then we found a way to work around it. Work continues...
Tuesday, September 15, 2009
The Band
The band is halfway done. The band is the perimeter of the floor framing, that sits atop (and is bolted to) the concrete piers. Today they will complete the screen porch and hallway sections, and perhaps get up a wall frame or two.

>
Friday, September 11, 2009
Rainy, muddy
Today I spent the morning chatting with roofers, plumbers, electricians and an HVAC guy, absorbing and processing all their information, in order to make a decision on who is going to do that work, how, and when. It rained ALL DAY today, so the ground was really muddy. And today was also the day that Home Depot made the gigantic drop of framing materials, which will begin to go into action after this weekend. AND our refrigerator was delivered today! What else: oh yeah - mud.
Piers sheathing removed, foundation holes filled
Hey, look - the piers are all done already! And the foundation holes are all filled-in! The gigantic load of framing materials from Home Depot is supposed to arrive sometime today, and soon construction of the band (the big beam that will run the perimeter of the floor) will start.
Wednesday, September 9, 2009
Piers poured today, met with Craig at night
Today the concrete crew poured the piers, and tonight we met with Craig (architect) about our plans for the kitchen cabinet situation. Stephanie came over to see the place for the first time, and weighed-in on some interior design ideas, as it is her profession. And she had some damn good ones! Thanks, Stephanie and Craig.
Tuesday, September 8, 2009
pouring the foundation
This morning we passed the engineering inspection for the foundation holes' depth and placement, so we were able to give the concrete crew the go ahead to pour. In a couple of days the pier footings will be dry, and it will be time to pour the actual piers on top of them. Then, framing will begin.